Demolition Survey

Conducted prior to a building or structure being demolished

The primary purpose of this survey is to identify any asbestos containing materials (ACMs) in the building so they can be removed before the demolition begins.

Our Asbestos Demolition Survey Includes…

Identification of Asbestos

Our surveyor will identify asbestos materials by visual inspection and sampling. Demlition surveys aim to access concealed areas of the building.  

Sampling and Analysis

Samples of suspected asbestos materials taken by our surveyors are analysed in a UKAS accredited laboratory to confirm the presence of asbestos.

Risk Assessment

Our surveyors calculate a material risk assessment of the potential for asbestos materials to release asbestos fibres into the air.

Fully Intrusive Investigation

Our surveyor will lift flooring, make holes in partition walls, open up boxing, inspect concealed ceiling voids and remove cladding.

Survey Report

Our report details the location, type, and condition of asbestos materials that should be removed before demolition work starts.

Unoccupied Buildings

The survey should be carried out in an unoccupied building to allow full access to all areas and not impose restrictions on the survey.